It must be a big problem again, I had a bronze oxide premium sport that was built on 5/21 it left Baja to san Diego without a QC hold and left on the rail freight on the 29th and then on 6/7 a 30 day QC hold was put on it
my Bronze Oxide sport premium changed build dates 4 times since April it was finally built on 5/21 on 5/29 it was put on the rail system to port with a 30 day quality control issue